[26] Yip,Y., Cheng,C., & Low,C. Sequencing of an M machine flow shop with setup, process-ing and removal times separated[J]. International Journal of Advanced ManufacturingTechnology, 2006,30:289-296.
[27] Ganesharajah,T., & N Hall. C Sriskandarajah. Design and operational issues in AGV-served manufacturing systems[J]. Annals of Operations Research, 1998,76:109-154.
[28] Dawande, M., Geismar, H., Sethi, S., & Sriskandarajah, C. Sequencing and schedulingin robotic cells: recent developments[J]. Journal of Scheduling, 2005,8:387-426.
[29] Batur, G., Karasan, O., & Akturk, M. Multiple part-type scheduling in flexible roboticcells[J]. International Journal of Production Economics, 2012,135(2):726-740
[30] Kim, M. Y., & Lee, Y. H. MIP models and hybrid algorithm for minimizing themakespan of parallel machines scheduling problem with a single server[J]. Computersand Operations Research, 2012,39:2457-2468.
[31] Su, C. Online LPT algorithms for parallel machines scheduling with a single server[J].Journal of Combnatorial Optimization, 2013,26:480-488.
[32] 周凌云, 赵钢, 孔继利和鞠红. 物流中心规划与设计[M].第1版.北京:清华大学出版社 北京交通大学出版社, 2010.
[33] 程洪海, 刘华群. 配送中心管理理论与实务[M].第1版.北京:清华大学出版社 北京交通大学出版社, 2011.
[34] 朱华. 配送中心管理与运作[M].第2版.北京:高等教育出版社, 2008.
[35] Douglas L. McWilliams, & Maranda E. McBride. A beam search heuristics to solve theparcel hub scheduling problem[J]. Computers and Industrial Engineering, 2012,62:1080-1092.